From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Mehran Kaini Baltimore,
MD 21030 · Cell: (443)932 1278 · mehrankaini@gmail.com Mehran.kaini@mastec.com OBJECTIVE
Over 16 years experience in telecom
and network made me a highly skilled Construction and project manager who can
solve problems, plan new projects and do maintenance for current projects. I
am multitasking person who can manage more than 3 projects at the time. I can
learn and train. I am highly skilled at Cell site A to Z and expert in
wireless Industries. I have history in planning, managing, and integrating
cell sites in field along with a variety of site types as a team leader and
supervisor; I also have experience in towers and high altitude workings. PROFESSIONAL
EXPERIENCE
A- Mastec Network Solution – Foreman -Install and Path Microwave links for ALU/SPRINT in BAWA
market as a head of 4 crew (Recent) -Work as a lead of troubleshooting and maintenance of
AT&T sites in BAWA area (ACAS) -Lead of Tower MOD project (Bechtel) for changing the guy
wires and ETC. -Foreman of Sprint 2.5 Project new Construction -Foreman of Colombia MD office Special Project
Feb2014 - Present B- MTMLLC. –Senior Crew Lead of cell
sites Work as Lead of UMTS
installation team in North Dakota AT&T project .install and cutover old
career with 850/1900 ALU new career lines and antennas – TMA’s and Duplexers -
Crew lead in Velocitel
& AT&T site audit and survey project in South Dakota
July 2013 –Jan2014 C-REAL Property
Management Capital – Maintenance & Lead Supervisor
Rockville, MD ·
Work as head with a team of
six to fix issues on residential
properties.
June 2012 –June 2013 D-NSN - Telecoms implementer and installer(CM)
Iran/Middle East ·
MTN/Iran cell PHASE1 to
PHASE4 NSN POI’s and hub site transmission September
2006 - December 2011 Implementation and integration of all Nokia zones for more
than 300 sites. ·
All TI work in NSN Ultra site
– FLEXI site & stack BTS sites, includes Integration of 75 plus sites. ·
Installed 10 BSC in NSN zones
& 30 Tellabs including Fiber optic works. ·
Various points of
interconnections for MTN/Iran cell (Transmission) in more Than 100 Cities in 5 States (about 150 POI s). ·
Placement of 65+ NSN Flexi
BTS H/W and Cross connections until OM. ·
Installed and adjusted most
of MUX Types, Tellabs, HIT, FIU19, Nera, SRA4, NEC, Siemens, and Motorola. ·
Strong Ability to install and
adjust NSN microwave links H/W and S/W Up to 16 E1/T1 or STM ·
Complete care of 25 Road site
in 3 major road and Off-road sites. ·
RF cabling for satellite and cable
install and repair and dish installation. E-IRIS Telecommunication Telecommunication and engineering
transmission planner
Iran,
Tehran
·
Supported the facilitation of
the MCCI expansion project by
working
February 2005 - April 2007 In a team of more than forty. ·
Consulted on transmission
Planning, optimization Planning, and Frequency planning, TX and MW design installation &
implementation By lead supervisors. ·
Cell upgrade and GPRS of 20
sites in Tehran province. ·
Compiled and prepared data
for frequency site arrangements, such as Call Off’s, consisting of more than 120 links. ·
Detailed LOS and TSS Drive
survey for microwave links for more than 120 sites in Mashhad. ·
Conducted and performed
technical site surveys for more than 100 sites involving drive testing and verification in North and
Northeast Iran. F- Puyagroup Company - Owner and Senior Program Manager
1998-2005Iran,Tehran ·
Installed and managed ISP's
(Internet service providers) which included software /
hardware and servers, LAN /WAN installation/maintenance/troubleshoot ·
Install/troubleshoot security
systems, including: cameras, DVRs, Alarm systems (fire and doors), security
locks remote controlling and monitoring ·
Installed P2P /P2MP wireless
links, AV transferring devices and, CCTV and
install/repair power backup systems such as UPS's Stabilizers and Rectifiers. EDUCATION
·
AZAD University -
Tehran, Iran Masters of Engineering, Telecom
·
Natural Resources University -
Karaj, Iran B.S. in Paper Industries - Mechanics and Instruments
SKILLS
·
Cell site construction and troubleshoot and
maintenance/Integration ·
Site acquisition/LOS survey ,audit and
planning ·
Strong PIM and Sweep experiences. ·
PDH-SDH-MW-E1/T1- transferring ·
Wireless-DAS-4GLTE-UMTS-CDMA-GSM- 2.5Ghz
& AC/DC power. ·
Windows and Mac -MS Office(Word, Excel,
PowerPoint) AutoCAD and Outlook; Web Programs, TCP /IP –
telnet – Hyper terminal Programs. Cisco experience. CERTIFICATIONS ·
Site acquisition/Cellular network/LOS survey
Cert. ·
IP networking Certification. ·
Anritsu Site master Certification. ·
RF Connectors Certification( Andrew/ RFS ) ·
RF Awareness Certification. ·
Fall Protection/Basic Rigging/ComTrain
Certification ·
Tower Climbing and Rescue
Certification.(Instructor) ·
OSHA30 and HSE Certification. ·
CPR/First Aid/AED Certification. ·
DOT-CSA & DEFENSIVE DRIVING
Certification ·
Alcohol and drug/Accident/Blood borne
Pathogens/Fire Safety/GHS HazCom Certification. ·
AT&T Supplier Awareness/Ask yourself
/ND502 2014 Certification. LANGUAGE
SKILLS
• Fluent in reading and listening,
Very good in speaking English & fluent in Farsi |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
Farsi |
Fluent |
|
|
Turkish |
Beginner |
|
|
|